TRACK SHIPMENT
SIMPET GLOBAL LOGISTICS

Boeing Must Be ‘in the Green’ Before 737 Max Cap Is Lifted, FAA Head Says

The FAA capped output of Boeing’s 737 Max at a rate of 38 per month in the wake of a January 2024 near-catastrophe, in which a door cover blew off during flight.

Post a Comment

Your email address will not be published. Required fields are marked *